PART RECOVERY
RECOVERY CHECK

Recovery Check

Eight short questions. We respond within one business day.

What is it about?

Which problem best describes your situation? Multiple choice possible.

Where is the part installed?

Industry drives material choice, acceptance path and acceptable tolerances.

What is being replaced?

Is it a single part, an assembly or a previously repaired item?

Material requirement

Must the original material be used exactly, or is a functionally equivalent alternative acceptable?

How critical is the part?

Multiple selection possible.

Roles involved

A recovery case often touches several functions. Please indicate which roles are involved or are likely to need to be involved.

Which role do you play in this case? *

Your perspective shapes who has to be involved next.

Which roles will likely have to be involved?

Multiple choice. A recovery solution is rarely carried by a single function.

Who is allowed to approve the solution? *

Multiple choice possible. The approval authority strongly shapes the later effort.

Is the approval path already known? *

A documented approval path saves weeks.

Is there an internal technical owner?

A named owner for the technical decision accelerates every recovery project.

Role / department / contact — if known

Timing, quantity and deadline

Choose the operating window and add quantity, deadline and current lead time.

What information is available?

Multiple selection possible.

📎 Upload files

Optional. Up to 100 MB per file. Drawings, images, STEP/IGES/STL, PDFs, ZIP, datasheets.

⬆️ Drop files here or